Industrial relocations? DCC takes care of it.

Industrial moves. This involves a lot. During a removal it is important to take into account the dismantling, (dis)assembly and transport of equipment and/or installations. It is also important to take into account hoisting, lifting and the application of (possible) permits.

When you work with us, you have only one point of contact for your project. You know that the project is not dependent on multiple parties, and therefore projects run more smoothly and faster.

Want to know more about our services, knowledge and experience? And how we can help you with your industrial relocation? You can read about it on this page!

Would you like to speak to an expert? Then contact us directly.

industrial relocation of a tank terminal

What sectors do you operate in?

Offshore & maritime

Ships Nuclear

Energy

Power plants High-voltage pylons Windmills

Tank terminals

Medical

Hospitals Nuclear

Industry

Chemical and petrochemical Food industry Nuclear

Inner-city

Houses and flats Renovations Works of art

One specialist for your project

When you want to move (parts of) a production hall, a machine or a factory, we speak of an industrial relocation. This involves complicated relocations where a specialist like us will draw up a well thought-out plan, and execute it.

Did you know that there are internal and external moves? We explain it to you briefly below.

industrial relocation by DCC

Internal relocation

When a machine or piece of equipment needs to be moved to another location in the factory, we call this an internal move. We then get to work on the disassembly, lifting plan and hoisting, transport plan and transportation, and assembly at the new location in the factory.

External relocation

In the case of a major industrial relocation to another location, we also take care of the dismantling, transport and assembly of the plant and equipment. Does it concern a large machine or installation? Then we also apply for the permit for the transport and write the necessary lifting plans to transport and lift the installations and equipment as safely as possible.

We have a big project. What else can you take off your hands?

Do you have a large project such as the (partial) demolition of an apartment complex, hospital complex, turn-around or tank terminals? Even then we can help you!

 

Circular demolition

  • Demolitions
  • Complete project care
  • Consultancy
  • Assembly and disassembly
  • Contractors

 

Maintenance

  • Inventory
  • Disassemble, assemble, replace and overhaul
  • Fabrication of structures
  • Reuse and restoration

Remediation

What other objects do you have experience with?

Tank terminals

Tanks

Lead

Office buildings

Houses / homes

Apartment Buildings

Apartment complexes

Hospitals

industrial relocation by DCC

Custom Industrial removals throughout the Netherlands

Industrial relocations are customized. No one move is the same, which is why we are happy to visit you to take stock of the situation. After we have a good picture of the current situation, we can get to work drawing up the lifting plans. With relocations, we also get to work on applying for the necessary exemptions, permits and engineering for safe and correct execution.

We can take everything related to the execution of your industrial relocation project off your hands. This way, you keep the overall picture and choose the scenario that best suits your project and budget.

How do you proceed?

We are happy to explain our working methods to you. You will then know exactly how we get started with your project.

 

#1 We come to you

After receiving your application, we will set up an appointment. During this appointment, we will ask specific questions about your project so that we know exactly what you want. Do you also have any questions for us? Then of course we can answer them.

 

#2 Create a custom quote

After our conversation, we have a good idea of how the move should be carried out and get to work on a customized quote. We will gladly come by again afterwards to explain the quotation and answer any questions you may have. During this meeting we will also tell you why this plan of action is the best choice for moving the installations / equipment.

 

 

#3 Setting up the schedule

Do you approve the quote? Then we get to work on making a schedule. That way we both know what, when and where something needs to be done.

 

#4 Getting started with the move

On the agreed dates, we get to work on the move. Our workers know exactly which installations need to be dismantled, transported and reassembled.

 

#5 Completing the project

The plant/equipment has been moved. Now the plant employees can use the machine again. As if nothing has changed except the place.

Need industrial relocation done by DCC?

Our personal approach, short lines and unique way of working ensure that projects run as efficiently as possible.

Request a free quote or contact us directly.